Pool Process
- Initial Meeting
- Estimating
- Renderings
- Approval
- Contract
- Good Faith Deposit
- Dig Alert
- Trenching
- Permit Received
- Excavate
- Install Rebar
- Do Pool Plumbing, Gas and Electric Lines
- Get First Inspection
- Shotcrete Homeowner Waters Shotcrete for 10 Days (14 Recommended)
- In the Interim, Set Pool Equipment , Lights and Finish Electrical Connections
- Install Coping and Tile
- Proceed with Exterior Concrete or Pavers etc around Pool Area
- Install Plaster in Pool
- Fill with Water and Start the Equipment as soon as full